Asset Tracking

Tags: Asset Tracking Solution

Track equipment, shipments, and other assets — indoors and outdoors — through a network of gateways and sensors, powered by BLE and BLE Mesh technology

RTLS

Real-Time Location Tracking

Get up-to-date location and movement data for assets on the map

Use filters by geofences, movement status, labels, and other parameters to quickly find the right assets and identify situations that require attention.

Real-Time Location Tracking
Real-Time Location Tracking
Previous
Next
Indoor

Indoor Tracking

Track assets indoors, floor by floor, where GPS signal is weak or unavailable

Buildings & Layers

Create buildings and divide them into layers. Upload a floor plan for each layer and position gateways on it to enable indoor location detection.

3D View

View the building structure in 3D. Zoom, rotate, and move around the model to see sensor and asset locations, including recent movement trails.

Movement Playback

Replay asset and sensor movement history directly on the 3D scheme, with adjustable playback speed.

Buildings & Layers
3D View
Movement Playback
Previous
Next
Accounting

Asset Management & Accounting

Easily organize your asset data with custom labels, structured fields, and reporting tools

Labeling System
Event Reporting
Additional Fields
Сoming soon

Labeling System

Group and categorize assets with color-coded or textual labels for filtering and identification. Let geofences do the work by automatically tagging assets as they move through different zones.

Labeling System

Event Reporting

Generate structured reports to analyze asset status, usage, location, and compliance data, providing valuable insights for financial and operational planning.

Event Reporting

Additional Fields

Add custom fields to your assets to track specific information like warranty dates, costs, or any details important for your organization.

Additional Fields
Сoming soon
Previous
Next
History Data

History of Events & Telemetry

Track your assets' complete history and analyze data through visual tools

History
Telemetry
Event History Icon

Events History

View comprehensive event history for your assets including label assignments and removals, movement tracking, geofence entries and exits, and communication status changes.

Event History
Telemetry Logs Icon

Telemetry Analysis

Review complete message history with detailed parameter values. Create custom charts to monitor specific metrics like fuel levels, temperature, humidity, and other sensor readings to support your operational decisions.

Telemetry Logs
Previous
Next

Сoming soon
Notifications & Automated Actions

Receive notifications, issue commands, and set up automated actions based on asset conditions

Notifications System

Remote Commands

Automated Actions

Receive timely alerts when assets enter or exit geofences, start moving, stop sending messages, and more. Stay informed about critical events without constant monitoring.

Сoming soon
Smart Notifications

Remotely control your devices with direct command transmission. Lock doors, activate alarms, adjust settings, and perform other operations from anywhere.

Сoming soon
Remote Commands

Build custom automation workflows based on real-time conditions. Define precise rules that automatically execute commands or system actions when specific criteria are met.

Сoming soon
Automated Triggers
Previous
Next
Billing

3 Billing Principles

Per Unit

No packages, pay for a necessary number of sensors, assets, and gateways

Per Day

Tariffing for each day, don't pay for 'dead souls'

By Set of Functions

Pay only for the set of functions/modules your client needs

Tariffs
Advanced
Limits
Sensors limit, per account
Up to 10000
Gateways limit, per account
Up to 500
Assets limit, per account
Up to 10000
Storage limit, per unit
Up to 100 MB
Geofences, per account
Up to 100
Users, per account
Up to 50
Storage period
Up to 1 year
Application modules
Location & Trips
Available
Geofences
Available
Buildings & Layers
Available
Reports
Available
Notifications Soon
Available
Actions Soon
Available
Price (EUR/sensor/month)
0.05 EUR
Price (EUR/gateway/month) *
0.1 EUR
Price (EUR/asset/month)
0.05 EUR
* For Mesh technology, anchors are counted and billed the same way as gateways.
Channels
10 EUR per channel / month *
Retranslators
10 EUR per retranslator / month
Service Fee
20 EUR / month
* Channel is required only for Mesh technology.
Calculator

Calculate your pricing

Fill out the form and get information about you personal pricing information

Tariff Plan

Advanced

Number of sensors:

Number of gateways:

Number of assets:

Total

Total sensors
0
Total gateways
0
Total assets
0
Total price
20.00 EUR
Service fee included: 20 EUR/month
In Our Blog

Tags: First steps in Asset tracking field

Asset tracking goes hand in hand with GPS monitoring and plays a key role in telematics and fleet management. It’s about using technology to monitor and manage physical assets — from containers and tools to heavy machinery and sensitive cargo.

These systems provide real-time data on location, movement, condition, and sensor metrics. This helps businesses protect assets, reduce losses, and streamline operations. Let’s take a closer look at the building blocks of a modern asset tracking system — the devices that make it all work.

Read more

Highlights of GPS-Trace Platform

Explore the unique features and options of the platform available through our solutions

Blog about GPS software, hardware and more